Home arrow Project Solutions
Palm Crossings Phase II PDF 

West Melbourne, FL

  palm_crossings_pahse_i_001   

Building Area

13,000 SF

Owner

Juster Development  

Architect

Cuhaci & Peterson Architects                  

In collaboration with Juster Develpoment, headquartered in Tarrytown, New York, and Cuhaci & Peterson Architects, HDE, Inc. completed Palm Crossings Phase II on time and within budget.  The 13,000 SF retail expansion to an existing Publix is anchored by Pet Supermarket.
 
Longwood Village Business Center PDF 

Longwood, FL

 lvbc_beths_chickasaw_002

Building Area

17,000 SF

Owner

St. Laurent Properties 

Architect

Bock & Partners Architecture           

HDE, Inc. was selected by Will St. Laurent of St. Laurent Properties to build this attractive retail facility located in Longwood, FLorida, on SR 427.

Anchored by Rebounderz, a youth entertainment facility, and also housing American Top Team, this center is completely leased and occupied.

This top quality project was completed by HDE, Inc. in just seven months, in spite of significant sitework challenges and design changes.

 
Chickasaw Retail Phase I PDF 

Orlando, FL

 chickasaw_finished_001

Building Area

18,000 SF

Owner

Poseidon VIII Investments, LLC

Architect

Cuhaci & Peterson Architects                        

HDE, Inc. was selected by Poseidon VIII Investments, LLC, based upon an aggressive schedule, a compettive price, and a proven ability to work with Cuhaci & Peterson Architects to deliver a high quality project.

With a site work package of nearly $1.0 M that inculded a 1.5 acre retention pond, 400 LF of county road, a lift station and site utilities for Phase I and II, this was a very unique project.

The owner is so pleased with the performance of the project team, he has requested the same HDE Superintendent and Project Manager for Phase II, scheduled to start early next year.

 
Universal Plaza PDF 

Orlando, Florida

 universal_shoppes

Building Area
16,000

Building Height
38’

Structural System
Structural Steel

Architects
Dale Parsons Architects

 

 

 

This 16,000 SF two story retail center was built for JNS Development of Miami, FL in seven months.  The shopping center contains retail space on the first floor with office suites on the second floor. HDE was selected based upon their competitive pricing, value engineering contribution, proposed project team, and retail experience.

 
The Dixie Shoppes PDF 

Orlando, Florida

 dixie_shoppe

Building Area
20,000 sf

Owner
Unicorp National Development

Architects
Scott Partnership Architects

 

In collaboration with Unicorp National Development and the Scott Partnership Architects, HDE completed this Retail Center in November 2003, just 5 ½ months from groundbreaking, located on Vineland Ave. next to Dolly Parton’s Dixie Stampede. Architectural features include a pre-engineered elliptical dome towering 48 feet above the brick paver plaza. The Center was fully leased within days of completion.

 
Atlantic Breeze PDF 
Daytona Beach Shores, Florida
 atlantic_breeze

Building Area
20,000 sf

Building Height
3 Floors

Structural System
Masonry Bearing with Structural Concrete Floors

Architects
Robert Harris, Architects

 

BPS Corporation selected HDE to build their first apartment building venture based upon a presentation and interview process. Located one block from the Atlantic Ocean, the project offered many design, regulatory, and construction challenges and was completed in three phases. A happy owner had the building 90% occupied within thirty days of completion in June, 2006.

 
Brandon Crossroads PDF 
Brandon, Florida
 brandon_crossroads

Building Area
20,000SF

Building Height
42’

Structural System
Steel & Concrete Block

Architects
Cuhaci & Peterson
 

 brandon_crossroads1

HDE was selected by Mr. Bob Fike based upon a close, successful working relationship developed when Mr. Fike was a development manager with Unicorp National Developments.

 

 

Completed in eight months, on schedule and within budget this attractive center is anchored by Old Chicago and was totally leased and occupied within two months of shell completion.

 

 
Causeway Shoppes PDF 

Brandon, Florida

causeway_shoppes 

Building Area
25,235 sf

Building Height
45’

Structural System
Structural Steel

Architects
Cuhaci & Peterson

 

HDE was chosen by developer Robert Fike to construct his second building in the Brandon area based on HDE’s performance on the Brandon Crossroads project. This attractive retail center includes a Washington Mutual Branch and a Mellow Mushroom restaurant to anchor the building. HDE completed this project in 170 calendar days in accordance with the contract documents and within the project proforma budget.

 

 
CNL Bank PDF 

Lake Mary, Florida

 cnl_bank

Building Area
5,400 sf

Building Height
1 floor

Structural System
Structural concrete
Structural steel
Pre-engineered trusses


Exterior Skin
Masonry, brick, EIFS

Architects
Robert Reid Wedding Architects & Planners, Inc.

cnl_bank1


The CNL Bank in Lake Mary is a 5,400 square foot facility located in the forefront of Oakmont Shopping Center.  This facility was completed and opened in January 2000, just six months after groundbreaking.

This high finish facility is the first of its kind featuring all brick exterior, two bell towers, copper and tile roofs, and such interior elements as Italian marble and mahogany casework.

HDE, Inc., in partnership with Robert Reid Wedding Architects and CNL, delivered a project of the highest quality on time and within budget.